CLARIDGE’S HOTEL
Timeframe
LIVE
Location
W1K, London
Client
Drive, Edgeware and Maybourne
THERE’S NO PLACE LIKE CLARIDGE’S…
-
Full Refurbishment
Extension - 3 floors added to the existing roof and 5 floors added within the basement
-
Full perimeter scaffolding to the roof extension
Low level scaffolds for exterior decoration works
Access solutions for lift shafts and a low level banner
Cranes and hoists utilised to due to the nature of the works
-
There were additional works added to the program throughout the duration.
Operatives remained on site to maintain communication with the hotel.
The hotel remained open throughout the entire duration - therefore our working patterns had to reflect the requirements of high-profile guests.
See more about the works at Claridge's in the BBC2 Documentary "The Mayfair Hotel Megabuild" available on BBC iPlayer.
SERVICES REQUIRED
OTHER PROJECTS